N84 Grid

LYTCHETT

DNO substation.

Contracted here0.09 GWNot yet connected, as printed
Entries in the queue3entries with a printed MW
Earliest connection date2 Sep 2026Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue88 MW across the first 3 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
LYTCHETT (other)30 Nov 20222 Sep 202612 MW
LYTCHETT (hybrid)10 Dec 201931 Dec 202612 MW
LYTCHETT (hybrid)28 Jun 20216 Dec 203664 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW50 MW100 MW2026: 24 MW2036: 88 MW20262028203020322034203688 MW
0 MW50 MW100 MW2026: 24 MW2036: 88 MW202620292032203688 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202624 MW
203688 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1LYTCHETT (other)12 MW0 MW2 Sep 2026not statedgate not printedAccepted to Connect
2LYTCHETT (hybrid)12 MW12 MW31 Dec 2026not statedgate not printedAccepted to Connect
3LYTCHETT (hybrid)64 MW24 MW6 Dec 2036not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2026224 MW
2036164 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
LYTCHETT (hybrid, 64 MW)Hybrid32 MW6 Dec 2036Accepted to Connect
LYTCHETT (battery, 25 MW)Battery storage25 MWnot statedConnected
LYTCHETT (solar, 13.68 MW)Solar13.68 MWnot statedConnected
LYTCHETT (other, 12 MW)Other12 MW2 Sep 2026Accepted to Connect
LYTCHETT (hybrid, 12 MW)Hybrid12 MW31 Dec 2026Accepted to Connect
LYTCHETT (battery, 25 MW)Battery storage0 MW6 Oct 2023Accepted to Connect
LYTCHETT (other, 12 MW)Other0 MWnot statedAccepted to Connect
LYTCHETT (other, 12 MW)Other0 MWnot statedAccepted to Connect
LYTCHETT (other, 12 MW)Other0 MWnot statedAccepted to Connect
LYTCHETT (solar, 13.7 MW)Solar0 MWnot statedAccepted to Connect
LYTCHETT (battery, 100 MW)Battery storage0 MWnot statedAccepted to Connect
LYTCHETT (other, 12 MW)Other0 MWnot statedAccepted to Connect

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.