N84 Grid

MACDUFF GRID

DNO substation.

Contracted here0.32 GWNot yet connected, as printed
Entries in the queue9entries with a printed MW
Earliest connection date10 Sep 2025Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue143.21 MW across the first 6 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
MACDUFF (solar)5 Feb 202410 Sep 20250.02 MW
MACDUFF GRID (other)14 Oct 202229 May 202648.19 MW
MACDUFF GRID (wind on)30 Sep 202131 May 20274.6 MW
MACDUFF GRID (solar)6 Oct 20266 Oct 202735.2 MW
MACDUFF GRID (solar)19 Dec 202431 Oct 202735.2 MW
MACDUFF GRID (solar)27 May 202531 Mar 202920 MW
MACDUFF GRID (hybrid)17 Aug 202330 Sep 202973.6 MW
MACDUFF GRID (gas)6 Jul 202230 Jun 203149.9 MW
MACDUFF GRID (bess)9 Jan 202531 Oct 203352.68 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW200 MW400 MW2025: 0 MW2026: 48 MW2027: 123 MW2029: 217 MW2031: 267 MW2033: 319 MW20252027202920312033319 MW
0 MW200 MW400 MW2025: 0 MW2026: 48 MW2027: 123 MW2029: 217 MW2031: 267 MW2033: 319 MW2025202820312033319 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
20250.02 MW
202648.21 MW
2027123.21 MW
2029216.81 MW
2031266.71 MW
2033319.39 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1MACDUFF (solar)0.02 MW0 MW10 Sep 2025not statedgate not printedAccepted to Connect
2MACDUFF GRID (other)48.19 MW0.02 MW29 May 2026not statedgate not printedAccepted to Connect
3MACDUFF GRID (wind on)4.6 MW48.21 MW31 May 2027not statedgate not printedAccepted to Connect
4MACDUFF GRID (solar)35.2 MW52.81 MW6 Oct 2027not statedgate not printedAccepted to Connect
5MACDUFF GRID (solar)35.2 MW88.01 MW31 Oct 2027not statedgate not printedAccepted to Connect
6MACDUFF GRID (solar)20 MW123.21 MW31 Mar 2029not statedgate not printedAccepted to Connect
7MACDUFF GRID (hybrid)73.6 MW143.21 MW30 Sep 2029not statedgate not printedAccepted to Connect
8MACDUFF GRID (gas)49.9 MW216.81 MW30 Jun 2031not statedgate not printedAccepted to Connect
9MACDUFF GRID (bess)52.68 MW266.71 MW31 Oct 2033not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
202510.02 MW
2026148.19 MW
2027375 MW
2029293.6 MW
2031149.9 MW
2033152.68 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
MACDUFF GRID (hybrid, 73.6 MW)Hybrid69.9 MW30 Sep 2029Accepted to Connect
MACDUFF GRID (battery, 52.68 MW)Battery storage50 MW31 Oct 2033Accepted to Connect
MACDUFF GRID (gas, 49.9 MW)Gas49.9 MW30 Jun 2031Accepted to Connect
MACDUFF GRID (other, 48.19 MW)Other48.19 MW29 May 2026Accepted to Connect
MACDUFF GRID (solar, 35.2 MW)Solar35.2 MW31 Oct 2027Accepted to Connect
MACDUFF GRID (solar, 35.2 MW)Solar35.2 MW6 Oct 2027Accepted to Connect
MACDUFF GRID (other, 21.85 MW)Other21.85 MWnot statedConnected
MACDUFF GRID (solar, 20 MW)Solar20 MW31 Mar 2029Accepted to Connect
MACDUFF GRID (onshore wind, 19.95 MW)Onshore wind19.95 MWnot statedConnected
MACDUFF GRID (onshore wind, 6.55 MW)Onshore wind6.56 MWnot statedConnected
MACDUFF GRID (onshore wind, 4.6 MW)Onshore wind4.6 MW31 May 2027Accepted to Connect
MACDUFF GRID (onshore wind, 4.37 MW)Onshore wind4.37 MWnot statedConnected
MACDUFF GRID (onshore wind, 4.37 MW)Onshore wind4.37 MWnot statedConnected
MACDUFF GRID (onshore wind, 4.37 MW)Onshore wind4.37 MWnot statedConnected
MACDUFF GRID (onshore wind, 4.37 MW)Onshore wind4.37 MWnot statedConnected
MACDUFF GRID (onshore wind, 2.4 MW)Onshore wind2.4 MWnot statedConnected
MACDUFF GRID (onshore wind, 2.28 MW)Onshore wind2.28 MWnot statedConnected
MACDUFF GRID (onshore wind, 1.65 MW)Onshore wind1.65 MWnot statedConnected
MACDUFF GRID (onshore wind, 0.85 MW)Onshore wind0.86 MWnot statedConnected
MACDUFF GRID (other, 0.85 MW)Other0.86 MWnot statedConnected
MACDUFF GRID (onshore wind, 0.8 MW)Onshore wind0.8 MWnot statedConnected
MACDUFF GRID (onshore wind, 0.76 MW)Onshore wind0.76 MWnot statedConnected
MACDUFF GRID (onshore wind, 0.76 MW)Onshore wind0.76 MWnot statedConnected
MACDUFF GRID (onshore wind, 0.76 MW)Onshore wind0.76 MWnot statedConnected
MACDUFF GRID (onshore wind, 0.76 MW)Onshore wind0.76 MWnot statedConnected
MACDUFF GRID (onshore wind, 0.76 MW)Onshore wind0.76 MWnot statedConnected
MACDUFF GRID (onshore wind, 0.76 MW)Onshore wind0.76 MWnot statedConnected
MACDUFF GRID (onshore wind, 0.76 MW)Onshore wind0.76 MWnot statedConnected
MACDUFF GRID (onshore wind, 0.43 MW)Onshore wind0.43 MWnot statedConnected
MACDUFF GRID (onshore wind, 0.31 MW)Onshore wind0.31 MWnot statedConnected
MACDUFF GRID (onshore wind, 0.21 MW)Onshore wind0.21 MWnot statedConnected
MACDUFF GRID (solar, 0.02 MW)Solar0.02 MW10 Sep 2025Accepted to Connect
MACDUFF GRID (battery, 52.68 MW)Battery storage0 MWnot statedAccepted to Connect
MACDUFF GRID (battery, 52.68 MW)Battery storage0 MWnot statedAccepted to Connect
MACDUFF GRID (onshore wind, 4.6 MW)Onshore wind0 MWnot statedAccepted to Connect
MACDUFF GRID (other, 48.19 MW)Other0 MWnot statedAccepted to Connect
MACDUFF GRID (gas, 49.9 MW)Gas0 MWnot statedAccepted to Connect
MACDUFF GRID (onshore wind, 2.3 MW)Onshore wind0 MWnot statedAccepted to Connect
MACDUFF GRID (onshore wind, 1.43 MW)Onshore wind0 MWnot statedConnected
MACDUFF GRID (solar, 48 MW)Solar0 MWnot statedAccepted to Connect
MACDUFF GRID (other, 37.5 MW)Other0 MWnot statedAccepted to Connect
MACDUFF GRID (hybrid, 104 MW)Hybrid0 MW4 Feb 2026Accepted to Connect
MACDUFF GRID (onshore wind, 2.3 MW)Onshore wind0 MWnot statedAccepted to Connect
MACDUFF GRID (gas, 20 MW)Gas0 MWnot statedAccepted to Connect
MACDUFF GRID (onshore wind, 2.3 MW)Onshore wind0 MWnot statedAccepted to Connect
MACDUFF GRID (onshore wind, 0.5 MW)Onshore wind0 MWnot statedAccepted to Connect

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.