N84 Grid

OXFORD

DNO substation.

Contracted here0.10 GWNot yet connected, as printed
Entries in the queue2entries with a printed MW
Earliest connection date1 Oct 2027Date printed in the register

The queue, in order

Order calculated by N84
First in queue99.89 MW across the first 2 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

  • OXFORD (solar)10 Jan 2024 to 1 Oct 2027 (gate not printed)
  • OXFORD (solar)15 Dec 2020 to 31 Dec 2027 (gate not printed)
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
OXFORD (solar)10 Jan 20241 Oct 202749.99 MW
OXFORD (solar)15 Dec 202031 Dec 202749.9 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW50 MW100 MW2027: 100 MW2027100 MW
0 MW50 MW100 MW2027: 100 MW2027100 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202799.89 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1OXFORD (solar)49.99 MW0 MW1 Oct 2027not statedgate not printedAccepted to Connect
2OXFORD (solar)49.9 MW49.99 MW31 Dec 2027not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2027299.89 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
OXFORD (solar, 49.99 MW)Solar49.99 MW1 Oct 2027Accepted to Connect
OXFORD (solar, 49.9 MW)Solar49.9 MW31 Dec 2027Accepted to Connect
OXFORD (other, 0.11 MW)Other0.11 MWnot statedConnected
OXFORD (other, 0.3 MW)Other0.06 MWnot statedConnected
OXFORD (solar, 4 MW)Solar0 MWnot statedAccepted to Connect

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.