N84 Grid

SHAFTESBURY

DNO substation.

Contracted here0.28 GWNot yet connected, as printed
Entries in the queue4entries with a printed MW
Earliest connection date20 Mar 2026Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue278.28 MW across the first 4 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
SHAFTESBURY (hybrid)20 Mar 202520 Mar 202660 MW
SHAFTESBURY (solar)11 Apr 202511 Apr 20263.64 MW
SHAFTESBURY (bess)24 Sep 20216 Dec 203699.9 MW
SHAFTESBURY (hybrid)21 Aug 20246 Dec 2036114.74 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW200 MW400 MW2026: 64 MW2036: 278 MW202620282030203220342036278 MW
0 MW200 MW400 MW2026: 64 MW2036: 278 MW2026202920322036278 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202663.64 MW
2036278.28 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1SHAFTESBURY (hybrid)60 MW0 MW20 Mar 2026not statedgate not printedAccepted to Connect
2SHAFTESBURY (solar)3.64 MW60 MW11 Apr 2026not statedgate not printedAccepted to Connect
3SHAFTESBURY (bess)99.9 MW63.64 MW6 Dec 2036not statedgate not printedAccepted to Connect
4SHAFTESBURY (hybrid)114.74 MW163.54 MW6 Dec 2036not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2026263.64 MW
20362214.64 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
SHAFTESBURY (battery, 99.9 MW)Battery storage99.9 MW6 Dec 2036Accepted to Connect
SHAFTESBURY (hybrid, 114.74 MW)Hybrid49.9 MW6 Dec 2036Accepted to Connect
SHAFTESBURY (hybrid, 60 MW)Hybrid31.58 MW20 Mar 2026Accepted to Connect
SHAFTESBURY (solar, 3.64 MW)Solar3.64 MW11 Apr 2026Accepted to Connect
SHAFTESBURY (other, 0.19 MW)Other0.19 MWnot statedConnected
SHAFTESBURY (other, 0.31 MW)Other0.19 MWnot statedConnected
SHAFTESBURY (other, 0.12 MW)Other0.12 MWnot statedConnected
SHAFTESBURY (other, 0.12 MW)Other0.12 MWnot statedConnected
SHAFTESBURY (other, 0.06 MW)Other0.06 MWnot statedConnected
SHAFTESBURY (solar, 0.15 MW)Solar0 MWnot statedAccepted to Connect
SHAFTESBURY (solar, 20 MW)Solar0 MW4 Feb 2026Accepted to Connect
SHAFTESBURY (battery, 0 MW)Battery storage0 MWnot statedAccepted to Connect
SHAFTESBURY (hybrid, 20 MW)Hybrid0 MW30 Dec 2025Accepted to Connect

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.