Contracted here0.20 GWNot yet connected, as printed
Entries in the queue8entries with a printed MW
Earliest connection date30 Jun 2026Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue120.73 MW across the first 6 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
STRICHEN (solar)2 Jun 202330 Jun 20260.65 MW
STRICHEN GRID (hybrid)4 Nov 202231 Aug 202674.6 MW
STRICHEN GRID (hybrid)30 Mar 202231 Oct 20279.9 MW
STRICHEN GRID (solar)2 Oct 202331 Oct 20275 MW
STRICHEN (solar)13 Apr 202631 Oct 20270.18 MW
STRICHEN GRID (solar)13 Dec 20243 Dec 202930.4 MW
STRICHEN GRID (bess)8 Nov 202131 Oct 203349.9 MW
STRICHEN GRID (other)18 Jan 202331 Oct 203325 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW100 MW200 MW2026: 75 MW2027: 90 MW2029: 121 MW2033: 196 MW20262027202820292030203120322033196 MW
0 MW100 MW200 MW2026: 75 MW2027: 90 MW2029: 121 MW2033: 196 MW2026202820302033196 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202675.25 MW
202790.33 MW
2029120.73 MW
2033195.63 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1STRICHEN (solar)0.65 MW0 MW30 Jun 2026not statedgate not printedAccepted to Connect
2STRICHEN GRID (hybrid)74.6 MW0.65 MW31 Aug 2026not statedgate not printedAccepted to Connect
3STRICHEN GRID (hybrid)9.9 MW75.25 MW31 Oct 2027not statedgate not printedAccepted to Connect
4STRICHEN GRID (solar)5 MW85.15 MW31 Oct 2027not statedgate not printedAccepted to Connect
5STRICHEN (solar)0.18 MW90.15 MW31 Oct 2027not statedgate not printedAccepted to Connect
6STRICHEN GRID (solar)30.4 MW90.33 MW3 Dec 2029not statedgate not printedAccepted to Connect
7STRICHEN GRID (bess)49.9 MW120.73 MW31 Oct 2033not statedgate not printedAccepted to Connect
8STRICHEN GRID (other)25 MW170.63 MW31 Oct 2033not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2026275.25 MW
2027315.08 MW
2029130.4 MW
2033274.9 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
STRICHEN GRID (hybrid, 74.6 MW)Hybrid67.1 MW31 Aug 2026Accepted to Connect
STRICHEN GRID (battery, 49.9 MW)Battery storage49.9 MW31 Oct 2033Accepted to Connect
STRICHEN GRID (solar, 30.4 MW)Solar30 MW3 Dec 2029Accepted to Connect
STRICHEN GRID (other, 25 MW)Other25 MW31 Oct 2033Accepted to Connect
STRICHEN GRID (hybrid, 9.9 MW)Hybrid9.9 MW31 Oct 2027Accepted to Connect
STRICHEN GRID (solar, 5 MW)Solar5 MW31 Oct 2027Accepted to Connect
STRICHEN GRID (onshore wind, 2.28 MW)Onshore wind2.28 MWnot statedConnected
STRICHEN GRID (onshore wind, 2.28 MW)Onshore wind2.28 MWnot statedConnected
STRICHEN GRID (onshore wind, 2.28 MW)Onshore wind2.28 MWnot statedConnected
STRICHEN GRID (onshore wind, 2.23 MW)Onshore wind2.23 MWnot statedConnected
STRICHEN GRID (onshore wind, 2.19 MW)Onshore wind2.19 MWnot statedConnected
STRICHEN GRID (onshore wind, 2.19 MW)Onshore wind2.19 MWnot statedConnected
STRICHEN GRID (onshore wind, 1.52 MW)Onshore wind1.52 MWnot statedConnected
STRICHEN GRID (onshore wind, 1 MW)Onshore wind1 MWnot statedConnected
STRICHEN GRID (onshore wind, 0.95 MW)Onshore wind0.95 MWnot statedConnected
STRICHEN GRID (onshore wind, 0.85 MW)Onshore wind0.86 MWnot statedConnected
STRICHEN GRID (onshore wind, 0.8 MW)Onshore wind0.8 MWnot statedConnected
STRICHEN GRID (onshore wind, 0.76 MW)Onshore wind0.76 MWnot statedConnected
STRICHEN GRID (onshore wind, 0.76 MW)Onshore wind0.76 MWnot statedConnected
STRICHEN GRID (onshore wind, 0.76 MW)Onshore wind0.76 MWnot statedConnected
STRICHEN GRID (onshore wind, 0.76 MW)Onshore wind0.76 MWnot statedConnected
STRICHEN GRID (onshore wind, 0.76 MW)Onshore wind0.76 MWnot statedConnected
STRICHEN GRID (other, 0.76 MW)Other0.76 MWnot statedConnected
STRICHEN GRID (onshore wind, 0.76 MW)Onshore wind0.76 MWnot statedConnected
STRICHEN GRID (onshore wind, 0.76 MW)Onshore wind0.76 MWnot statedConnected
STRICHEN GRID (solar, 0.65 MW)Solar0.65 MW30 Jun 2026Accepted to Connect
STRICHEN GRID (onshore wind, 0.47 MW)Onshore wind0.48 MWnot statedConnected
STRICHEN GRID (onshore wind, 0.43 MW)Onshore wind0.43 MWnot statedConnected
STRICHEN GRID (other, 0.09 MW)Other0.09 MWnot statedConnected
STRICHEN GRID (solar, 88 MW)Solar0 MW30 Jul 2028Accepted to Connect
STRICHEN GRID (other, 25 MW)Other0 MWnot statedAccepted to Connect
STRICHEN GRID (solar, 0.2 MW)Solar0 MWnot statedAccepted to Connect
STRICHEN GRID (solar, 88 MW)Solar0 MWnot statedAccepted to Connect
STRICHEN GRID (solar, 0.07 MW)Solar0 MW8 Apr 2027Accepted to Connect
STRICHEN GRID (other, 10 MW)Other0 MWnot statedAccepted to Connect
STRICHEN GRID (hybrid, 74.6 MW)Hybrid0 MWnot statedAccepted to Connect
STRICHEN GRID (solar, 27 MW)Solar0 MWnot statedAccepted to Connect
STRICHEN GRID (hybrid, 14.2 MW)Hybrid0 MWnot statedAccepted to Connect
STRICHEN GRID (solar, 0.18 MW)Solar0 MW31 Oct 2027Accepted to Connect
STRICHEN GRID (solar, 0.17 MW)Solar0 MWnot statedAccepted to Connect
STRICHEN GRID (other, 75 MW)Other0 MWnot statedAccepted to Connect