DYCE GRID (battery, 49.9 MW)

Developer as published, connection site, reference: DYCE GRID. SSEN-1MW-93ca380fd8e0-2.

Sign in to watch this project
Capacity49.9 MWBattery storage
Connection date30 Jul 2028Status as printed: Accepted to Connect
MW ahead in N84's order at this site160.85 MWcalculated by N84

Connection date, edition by edition

20282029File dated 2024-04-01: connection date 2028-07-30Jul 2028File dated 2026-10-01: connection date 2028-07-301 Apr20241 Oct2026
20282029File dated 2024-04-01: connection date 2028-07-30Jul 2028File dated 2026-10-01: connection date 2028-07-301 Apr20241 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 1 Apr 2024 to 1 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.