SENECA

Developer as published, connection site, reference: FRONTIER POWER INTERNATIONAL LIMITED. Mablethorpe 400kV Substation (NGET). PRO-000981.

Sign in to watch this project
Capacity1,200 MWInterconnector, Gate 1
Connection date30 Nov 2031Status as printed: Scoping
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

20312032File dated 2022-02-15: connection date 2031-11-30Nov 2031File dated 2026-10-20: connection date 2031-11-3015 Feb202220 Oct2026
20312032File dated 2022-02-15: connection date 2031-11-30Nov 2031File dated 2026-10-20: connection date 2031-11-3015 Feb202220 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 15 Feb 2022 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

N84 holds 7 editions of the NESO Interconnector Register back to 15 Feb 2022. No change for this record is older than 30 days.

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.

Supported by National Energy SO Open Data