ALNESS GRID (onshore wind)

Developer as published, connection site, reference: ALNESS GRID. SSEN-1MW-c5e251153812-6. Not in the latest file

Sign in to watch this project
Capacity0 MWOnshore wind
Connection date30 Jun 2025Status as printed: Accepted to Connect
MW ahead in N84's order at this siteNot calculatedN84 orders only projects at a NESO connection site with a printed date.

Connection date, edition by edition

20252026File dated 2023-08-01: connection date 2025-06-30Jun 2025File dated 2026-09-01: connection date 2025-06-301 Aug20231 Sep2026
20252026File dated 2023-08-01: connection date 2025-06-30Jun 2025File dated 2026-09-01: connection date 2025-06-301 Aug20231 Sep2026

The connection date is printed the same in every file N84 holds for this project, from 1 Aug 2023 to 1 Sep 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 1 Oct 2026. Not printed in this file; printed in the previous one. Between the files dated 1 Sep 2026 and 1 Oct 2026. Correction after an older file was importedpresent → missingReceipt: SSEN Embedded Capacity Register, file dated 1 Oct 2026Receipt: SSEN Embedded Capacity Register, file dated 1 Sep 2026, row 2664