PHEAD NORTH ST (solar)

Developer as published, connection site, reference: PHEAD NORTH ST. SSEN-50KW-31b7cc7d6ed3. Removed from the register (not present in two consecutive files)

Sign in to watch this project
Capacity0 MWSolar
Connection date20 Mar 2027Status as printed: Accepted to Connect
MW ahead in N84's order at this siteNot calculatedN84 orders only projects at a NESO connection site with a printed date.

Connection date, edition by edition

20272028File dated 2026-05-01: connection date 2027-03-20Mar 2027File dated 2026-06-01: connection date 2027-03-201 May20261 Jun2026
20272028File dated 2026-05-01: connection date 2027-03-20Mar 2027File dated 2026-06-01: connection date 2027-03-201 May20261 Jun2026

The connection date is printed the same in every file N84 holds for this project, from 1 May 2026 to 1 Jun 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.