N84 Grid

DAVIDSON FARM PV AND BESS

Developer as published, connection site, reference: IG Renewables Limited. Blackhillock 2 400/33kV GSP Substation (SHET). PRO-005808.

Sign in to watch this project
Capacity45 MWHybrid, Gate 1
Connection date31 Oct 2035Status as printed: Scoping
MW ahead in N84's order at this site199.3 MWcalculated by N84

Connection date, edition by edition

No date history to draw

The files N84 holds in your history window print no connection date for this project.

Observed changes

N84 holds 2 editions of the NESO Embedded Register back to 7 Nov 2025. No change for this record is older than 30 days.

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Customer name printed as IG Renewables Limited (previous file: IG RENEWABLE ENERGY UK LTD). N84 holds no copy between 7 Nov 2025 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedIG RENEWABLE ENERGY UK LTD → IG Renewables LimitedReceipt: NESO Embedded Register, file dated 20 Oct 2026, row 165Receipt: NESO Embedded Register, file dated 7 Nov 2025, row 165
  2. 20 Oct 2026. Connection site printed as Blackhillock 2 400/33kV GSP Substation (previous file: Keith 3 GSP). N84 holds no copy between 7 Nov 2025 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedKeith 3 GSP → Blackhillock 2 400/33kV GSP SubstationReceipt: NESO Embedded Register, file dated 20 Oct 2026, row 165Receipt: NESO Embedded Register, file dated 7 Nov 2025, row 165
  3. 20 Oct 2026. Gate printed as 1 (previous file: blank). N84 holds no copy between 7 Nov 2025 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedblank → 1Receipt: NESO Embedded Register, file dated 20 Oct 2026, row 165Receipt: NESO Embedded Register, file dated 7 Nov 2025, row 165
  4. 20 Oct 2026. MW Effective From printed as 31 Oct 2035 (previous file: blank). N84 holds no copy between 7 Nov 2025 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedReceipt: NESO Embedded Register, file dated 20 Oct 2026, row 165Receipt: NESO Embedded Register, file dated 7 Nov 2025, row 165

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.