BRORA GRID (onshore wind)

Developer as published, connection site, reference: BRORA GRID. SSEN-1MW-9ab0ba4fd8cd. Removed from the register (not present in two consecutive files)

Sign in to watch this project
Capacity0 MWOnshore wind
Connection date22 Jun 2017Status as printed: Accepted to Connect
MW ahead in N84's order at this siteNot calculatedN84 orders only projects at a NESO connection site with a printed date.

Connection date, edition by edition

20172018File dated 2023-08-01: connection date 2017-06-22Jun 2017File dated 2026-03-01: connection date 2017-06-221 Aug20231 Mar2026
20172018File dated 2023-08-01: connection date 2017-06-22Jun 2017File dated 2026-03-01: connection date 2017-06-221 Aug20231 Mar2026

The connection date is printed the same in every file N84 holds for this project, from 1 Aug 2023 to 1 Mar 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.