BRORA GRID

DNO substation.

Contracted here0.14 GWNot yet connected, as printed
Entries in the queue2entries with a printed MW
Earliest connection date31 Oct 2030Date printed in the register

The queue, in order

Order calculated by N84
First in queue137.88 MW across the first 2 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
BRORA GRID (other)6 Jul 202231 Oct 203052.68 MW
BRORA GRID (other)23 Nov 202331 Oct 203485.2 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW100 MW200 MW2030: 53 MW2034: 138 MW20302031203220332034138 MW
0 MW100 MW200 MW2030: 53 MW2034: 138 MW203020322034138 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
203052.68 MW
2034137.88 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1BRORA GRID (other)52.68 MW0 MW31 Oct 2030not statedgate not printedAccepted to Connect
2BRORA GRID (other)85.2 MW52.68 MW31 Oct 2034not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2030152.68 MW
2034185.2 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
BRORA GRID (other, 85.2 MW)Other66 MW31 Oct 2034Accepted to Connect
BRORA GRID (other, 52.68 MW)Other50 MW31 Oct 2030Accepted to Connect
BRORA GRID (hydro, 0.1 MW)Hydro and pumped storage0.1 MWnot statedConnected
BRORA GRID (hydro, 0.09 MW)Hydro and pumped storage0.09 MWnot statedConnected
BRORA GRID (other, 0.09 MW)Other0.09 MWnot statedConnected
BRORA GRID (onshore wind, 15 MW)Onshore wind0 MW22 Jun 2017Accepted to Connect
BRORA GRID (other, 52.68 MW)Other0 MWnot statedAccepted to Connect
BRORA GRID (other, 52.68 MW)Other0 MWnot statedAccepted to Connect
BRORA GRID (other, 52.68 MW)Other0 MWnot statedAccepted to Connect
BRORA GRID (onshore wind, 27.2 MW)Onshore wind0 MWnot statedAccepted to Connect

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.