Fraddon Bsp (battery, 10 MW)

Developer as published, connection site, reference: Fraddon. NGED-ALL-08db568b78e3.

Sign in to watch this project
Capacity10 MWBattery storage
Connection date20 Oct 2026Status as printed: Accepted to Connect
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

Only one edition so far

N84 holds one edition of this register for the project, so there is no earlier date to compare. The chart appears when a later edition is collected.

Observed changes

N84 holds 1 edition of the NGED Embedded Capacity Register back to 14 Aug 2026. No change for this record is older than 30 days.

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.