N84 Grid

Fraddon

DNO substation.

Contracted here0.15 GWNot yet connected, as printed
Entries in the queue7entries with a printed MW
Earliest connection date20 Oct 2026Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue123.3 MW across the first 6 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Fraddon Bsp (bess)8 Jul 202420 Oct 202610 MW
Fraddon Bsp (wind on)7 Feb 20244 Jan 202713.5 MW
Fraddon Bsp (bess)22 Nov 202111 Feb 20275.63 MW
Fraddon Bsp (bess)23 May 202425 Jun 202770.2 MW
Fraddon Bsp (solar)5 Jan 202310 Sep 20275.97 MW
Fraddon Bsp (wind on)3 Jul 202623 Nov 202718 MW
Fraddon Bsp (hybrid)31 Jul 202310 Jan 203724.2 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW100 MW200 MW2026: 10 MW2027: 123 MW2037: 148 MW202620282030203220342037148 MW
0 MW100 MW200 MW2026: 10 MW2027: 123 MW2037: 148 MW20262029203220352037148 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202610 MW
2027123.3 MW
2037147.5 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Fraddon Bsp (bess)10 MW0 MW20 Oct 2026not statedgate not printedAccepted to Connect
2Fraddon Bsp (wind on)13.5 MW10 MW4 Jan 2027not statedgate not printedAccepted to Connect
3Fraddon Bsp (bess)5.63 MW23.5 MW11 Feb 2027not statedgate not printedAccepted to Connect
4Fraddon Bsp (bess)70.2 MW29.13 MW25 Jun 2027not statedgate not printedAccepted to Connect
5Fraddon Bsp (solar)5.97 MW99.33 MW10 Sep 2027not statedgate not printedAccepted to Connect
6Fraddon Bsp (wind on)18 MW105.3 MW23 Nov 2027not statedgate not printedAccepted to Connect
7Fraddon Bsp (hybrid)24.2 MW123.3 MW10 Jan 2037not statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the NGED Embedded Capacity Register, file dated 14 Aug 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2026110 MW
20275113.3 MW
2037124.2 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Fraddon (battery, 70.2 MW)Battery storage70.2 MW25 Jun 2027Accepted to Connect
Fraddon (hybrid, 19.2 MW)Hybrid19.2 MW10 Jan 2037Accepted to Connect
Fraddon (onshore wind, 18 MW)Onshore wind18 MW23 Nov 2027Accepted to Connect
Fraddon (onshore wind, 13.5 MW)Onshore wind13.5 MW4 Jan 2027Accepted to Connect
Fraddon (solar, 11.17 MW)Solar11.17 MWnot statedConnected
Fraddon (battery, 10 MW)Battery storage10 MW20 Oct 2026Accepted to Connect
Fraddon (onshore wind, 10 MW)Onshore wind10 MWnot statedConnected
Fraddon (solar, 9.5 MW)Solar9.5 MWnot statedConnected
Fraddon (solar, 9.5 MW)Solar9.5 MWnot statedConnected
Fraddon (onshore wind, 9.12 MW)Onshore wind9.12 MWnot statedConnected
Fraddon (solar, 7.89 MW)Solar7.89 MWnot statedConnected
Fraddon (solar, 5.96 MW)Solar5.97 MW10 Sep 2027Accepted to Connect
Fraddon (solar, 5.67 MW)Solar5.67 MWnot statedConnected
Fraddon (battery, 5 MW)Battery storage5 MW11 Feb 2027Accepted to Connect
Fraddon (solar, 4.75 MW)Solar4.75 MWnot statedConnected
Fraddon (solar, 4.75 MW)Solar4.75 MWnot statedConnected
Fraddon (solar, 4.75 MW)Solar4.75 MWnot statedConnected
Fraddon (solar, 4.75 MW)Solar4.75 MWnot statedConnected
Fraddon (solar, 4.71 MW)Solar4.71 MWnot statedConnected
Fraddon (solar, 4.08 MW)Solar4.09 MWnot statedConnected
Fraddon (solar, 3.8 MW)Solar3.8 MWnot statedConnected
Fraddon (onshore wind, 3.8 MW)Onshore wind3.8 MWnot statedConnected
Fraddon (solar, 3.33 MW)Solar3.33 MWnot statedConnected
Fraddon (solar, 1.43 MW)Solar1.43 MWnot statedConnected
Fraddon (gas, 1.19 MW)Gas1.19 MWnot statedConnected
Fraddon (solar, 0.95 MW)Solar0.95 MWnot statedConnected
Fraddon (onshore wind, 0.47 MW)Onshore wind0.48 MWnot statedConnected
Fraddon (onshore wind, 0.47 MW)Onshore wind0.48 MWnot statedConnected
Fraddon (onshore wind, 0.47 MW)Onshore wind0.48 MWnot statedConnected
Fraddon (onshore wind, 0.47 MW)Onshore wind0.48 MWnot statedConnected
Fraddon (onshore wind, 0.47 MW)Onshore wind0.48 MWnot statedConnected
Fraddon (gas, 0.24 MW)Gas0.24 MWnot statedConnected
Fraddon (solar, 0.24 MW)Solar0.24 MWnot statedConnected
Fraddon (onshore wind, 0.21 MW)Onshore wind0.21 MWnot statedConnected
Fraddon (solar, 0.13 MW)Solar0.13 MWnot statedConnected
Fraddon (onshore wind, 0.11 MW)Onshore wind0.11 MWnot statedConnected
Fraddon (solar, 0.09 MW)Solar0.09 MWnot statedConnected
Fraddon (hybrid, 0.09 MW)Hybrid0.09 MWnot statedConnected
Fraddon (solar, 0.09 MW)Solar0.09 MWnot statedConnected
Fraddon (onshore wind, 0.08 MW)Onshore wind0.08 MWnot statedConnected
Fraddon (onshore wind, 0.08 MW)Onshore wind0.08 MWnot statedConnected
Fraddon (solar, 0.08 MW)Solar0.08 MWnot statedConnected
Fraddon (hybrid, 0.08 MW)Hybrid0.08 MWnot statedConnected
Fraddon (onshore wind, 0.08 MW)Onshore wind0.08 MWnot statedConnected
Fraddon (onshore wind, 0.08 MW)Onshore wind0.08 MWnot statedConnected
Fraddon (onshore wind, 0.08 MW)Onshore wind0.08 MWnot statedConnected
Fraddon (onshore wind, 0.08 MW)Onshore wind0.08 MWnot statedConnected
Fraddon (solar, 0.06 MW)Solar0.06 MWnot statedConnected
Fraddon (solar, 0.06 MW)Solar0.06 MWnot statedConnected
Fraddon (solar, 0.05 MW)Solar0.05 MWnot statedConnected
Fraddon (onshore wind, 0.05 MW)Onshore wind0.05 MWnot statedConnected
Fraddon (onshore wind, 0.05 MW)Onshore wind0.05 MWnot statedConnected
Fraddon (solar, 0.05 MW)Solar0.05 MWnot statedConnected
Fraddon (solar, 0.05 MW)Solar0.05 MWnot statedConnected
Fraddon (onshore wind, 0.05 MW)Onshore wind0.05 MWnot statedConnected