N84 Grid

FAB Link Interconnector

Developer as published, connection site, reference: FAB Link Limited. Exeter 400kV Substation (NGET). PRO-000281.

Sign in to watch this project
Capacity1,250 MWInterconnector
Connection date30 Sep 2032Status as printed: Awaiting Consents
First date seen 1 Apr 2025, difference +2739 dayscalculated by N84
MW ahead in N84's order at this site431.9 MWcalculated by N84

Connection date, edition by edition

20322033File dated 2022-02-15: connection date 2032-09-30Sep 2032File dated 2026-10-20: connection date 2032-09-3015 Feb202220 Oct2026
20322033File dated 2022-02-15: connection date 2032-09-30Sep 2032File dated 2026-10-20: connection date 2032-09-3015 Feb202220 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 15 Feb 2022 to 20 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 22 Sep 2026.

No changes observed in the files N84 holds for this window.

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.