KINTORE GRID (other, 20 MW)

Developer as published, connection site, reference: KINTORE GRID. SSEN-1MW-7d0e8fcbf0db.

Sign in to watch this project
Capacity20 MWOther
Connection date30 Sep 2029Status as printed: Accepted to Connect
MW ahead in N84's order at this site105 MWcalculated by N84

Connection date, edition by edition

20292030File dated 2023-12-01: connection date 2029-09-30Sep 2029File dated 2026-10-01: connection date 2029-09-301 Dec20231 Oct2026
20292030File dated 2023-12-01: connection date 2029-09-30Sep 2029File dated 2026-10-01: connection date 2029-09-301 Dec20231 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 1 Dec 2023 to 1 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.