Cnoc Buidhe Wind Farm

Developer as published, connection site, reference: CNOC BUIDHE WIND ENERGY HUB LIMITED. Cnoc Buidhe 132kV/33kV Substation (SHET). PRO-001672.

Sign in to watch this project
Capacity220 MWHybrid
Connection date31 Oct 2034Status as printed: Scoping
First date seen 31 Oct 2028, difference +2191 dayscalculated by N84
MW ahead in N84's order at this site0 MWcalculated by N84

Connection date, edition by edition

Only one edition so far

N84 holds one edition of this register for the project, so there is no earlier date to compare. The chart appears when a later edition is collected.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.