Wull Muir Wind Farm

Developer as published, connection site, reference: ENERGIEKONTOR UK LTD. Kaimes GSP (SPT). PRO-005854.

Sign in to watch this project
Capacity43.8 MWOnshore wind
Connection date1 Oct 2029Status as printed: Scoping
MW ahead in N84's order at this site51 MWcalculated by N84

Connection date, edition by edition

No date history to draw

The files N84 holds in your history window print no connection date for this project.

Observed changes

N84 holds 2 editions of the NESO Embedded Register back to 7 Nov 2025. No change for this record is older than 30 days.

Showing changes in files dated from 23 Sep 2026.

  1. 20 Oct 2026. Connection site printed as Kaimes GSP (previous file: Burdiehouse BESS 275kV Substation). N84 holds no copy between 7 Nov 2025 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedBurdiehouse BESS 275kV Substation → Kaimes GSPReceipt: NESO Embedded Register, file dated 20 Oct 2026, row 559Receipt: NESO Embedded Register, file dated 7 Nov 2025, row 558
  2. 20 Oct 2026. MW Effective From printed as 1 Oct 2029 (previous file: blank). N84 holds no copy between 7 Nov 2025 and 20 Oct 2026; this change happened at some point in that time. Wide comparison Correction after an older file was importedReceipt: NESO Embedded Register, file dated 20 Oct 2026, row 559Receipt: NESO Embedded Register, file dated 7 Nov 2025, row 558