BURGHFIELD RESERVE (solar)

Developer as published, connection site, reference: BURGHFIELD RESERVE. SSEN-1MW-75e9e09e4942. Removed from the register (not present in two consecutive files)

Sign in to watch this project
Capacity0 MWSolar
Connection date30 Apr 2026Status as printed: Accepted to Connect
MW ahead in N84's order at this siteNot calculatedN84 orders only projects at a NESO connection site with a printed date.

Connection date, edition by edition

20262027File dated 2023-08-01: connection date 2026-04-30Apr 2026File dated 2026-01-01: connection date 2026-04-301 Aug20231 Jan2026
20262027File dated 2023-08-01: connection date 2026-04-30Apr 2026File dated 2026-01-01: connection date 2026-04-301 Aug20231 Jan2026

The connection date is printed the same in every file N84 holds for this project, from 1 Aug 2023 to 1 Jan 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.