MILTON OF CRAIGIE GRID (solar, 25 MW)

Developer as published, connection site, reference: MILTON OF CRAIGIE GRID. SSEN-1MW-8139e5ed5e55.

Sign in to watch this project
Capacity25 MWSolar
Connection date26 Aug 2030Status as printed: Accepted to Connect
MW ahead in N84's order at this site50 MWcalculated by N84

Connection date, edition by edition

20302031File dated 2025-09-01: connection date 2030-08-26Aug 2030File dated 2026-10-01: connection date 2030-08-261 Sep20251 Oct2026
20302031File dated 2025-09-01: connection date 2030-08-26Aug 2030File dated 2026-10-01: connection date 2030-08-261 Sep20251 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 1 Sep 2025 to 1 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.