Capacity0.01 MWSolar
Connection date19 Jun 2026Status as printed: Accepted to Connect
MW ahead in N84's order at this site0.09 MWcalculated by N84
Connection date, edition by edition
The connection date is printed the same in every file N84 holds for this project, from 1 Jul 2025 to 1 Oct 2026. Year marks on the side are 1 January.
Observed changes
Showing changes in files dated from 23 Sep 2026.
No changes observed in the files N84 holds for this window.