NURSLING GSP (battery)

Developer as published, connection site, reference: NURSLING GSP. SSEN-1MW-776990cf5ae4. Removed from the register (not present in two consecutive files)

Sign in to watch this project
Capacity0 MWBattery storage
Connection date31 Dec 2036Status as printed: Accepted to Connect
MW ahead in N84's order at this siteNot calculatedN84 orders only projects at a NESO connection site with a printed date.

Connection date, edition by edition

20362037File dated 2023-08-01: connection date 2036-12-31Dec 2036File dated 2026-06-01: connection date 2036-12-311 Aug20231 Jun2026
20362037File dated 2023-08-01: connection date 2036-12-31Dec 2036File dated 2026-06-01: connection date 2036-12-311 Aug20231 Jun2026

The connection date is printed the same in every file N84 holds for this project, from 1 Aug 2023 to 1 Jun 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.