LUNANHEAD (other)

Developer as published, connection site, reference: LUNANHEAD GRID. SSEN-1MW-3a63a912a6b8-2. Removed from the register (not present in two consecutive files)

Sign in to watch this project
Capacity0 MWOther
Connection date31 Oct 2032Status as printed: Accepted to Connect
MW ahead in N84's order at this siteNot calculatedN84 orders only projects at a NESO connection site with a printed date.

Connection date, edition by edition

20322033File dated 2023-09-01: connection date 2032-10-31Oct 2032File dated 2026-08-01: connection date 2032-10-311 Sep20231 Aug2026
20322033File dated 2023-09-01: connection date 2032-10-31Oct 2032File dated 2026-08-01: connection date 2032-10-311 Sep20231 Aug2026

The connection date is printed the same in every file N84 holds for this project, from 1 Sep 2023 to 1 Aug 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

  1. 1 Oct 2026. Not printed in two consecutive files. Between the files dated 1 Sep 2026 and 1 Oct 2026.missing → left_registerReceipt: SSEN Embedded Capacity Register, file dated 1 Oct 2026Receipt: SSEN Embedded Capacity Register, file dated 1 Aug 2026, row 2497