CARRADALE GRID (onshore wind, 52.8 MW)

Developer as published, connection site, reference: CARRADALE GRID. SSEN-1MW-d5833abf85d1.

Sign in to watch this project
Capacity52.8 MWOnshore wind
Connection date29 Sep 2028Status as printed: Accepted to Connect
MW ahead in N84's order at this site167.06 MWcalculated by N84

Connection date, edition by edition

20282029File dated 2026-08-01: connection date 2028-09-29Sep 2028File dated 2026-10-01: connection date 2028-09-291 Aug20261 Oct2026
20282029File dated 2026-08-01: connection date 2028-09-29Sep 2028File dated 2026-10-01: connection date 2028-09-291 Aug20261 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 1 Aug 2026 to 1 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.