DOUNREAY (battery, 34 MW)

Developer as published, connection site, reference: DOUNREAY. SSEN-1MW-811df25d7d13.

Sign in to watch this project
Capacity34 MWBattery storage
Connection date31 Jul 2026Status as printed: Accepted to Connect
MW ahead in N84's order at this site9.8 MWcalculated by N84

Connection date, edition by edition

20262027File dated 2023-08-01: connection date 2026-07-31Jul 2026File dated 2026-10-01: connection date 2026-07-311 Aug20231 Oct2026
20262027File dated 2023-08-01: connection date 2026-07-31Jul 2026File dated 2026-10-01: connection date 2026-07-311 Aug20231 Oct2026

The connection date is printed the same in every file N84 holds for this project, from 1 Aug 2023 to 1 Oct 2026. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.