Staythorpe 400kV Substation

NESO connection site, host NGET.

Contracted here1.89 GWNot yet connected, as printed
Entries in the queue5entries with a printed MW
Earliest connection date31 May 2027Date printed in the register

The queue, in order

Order calculated by N84
First in queue1,886.9 MW across the first 5 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Flash Solar Farm31 May 202431 May 2027360 MW
Flash Solar Farm31 May 20241 May 2028440 MW
Staythorpe (BESS and PV)31 May 202429 Sep 2028437 MW
Field Farm31 May 202430 Sep 2030249.9 MW
Staythorpe31 May 202431 Oct 2030400 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW1.0 GW2.0 GW2027: 360 MW2028: 1.2 GW2030: 1.9 GW20272028202920301.9 GW
0 MW1.0 GW2.0 GW2027: 360 MW2028: 1.2 GW2030: 1.9 GW20272028202920301.9 GW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
2027360 MW
20281,237 MW
20301,886.9 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Flash Solar Farm360 MW0 MW31 May 2027not statedgate not printedConsents Approved
2Flash Solar Farm440 MW360 MW1 May 2028not statedgate not printedConsents Approved
3Staythorpe (BESS and PV)437 MW800 MW29 Sep 2028not statedgate not printedConsents Approved
4Field Farm249.9 MW1,237 MW30 Sep 20301gate 1Scoping
5Staythorpe400 MW1,486.9 MW31 Oct 20301gate 1Scoping

Receipt: MW and dates as printed in the NESO TEC Register, file dated 20 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
20271360 MW
20282877 MW
20302649.9 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Staythorpe CGas1,752 MWnot statedBuilt
Flash Solar FarmHybrid800 MW1 May 2028Consents Approved
Staythorpe (BESS and PV)Hybrid437 MW29 Sep 2028Consents Approved
Staythorpe (ENSO GREEN HOLDINGS X LIMITED)Hybrid400 MW31 Oct 2030Scoping
Field FarmBattery storage249.9 MW30 Sep 2030Scoping

Supported by National Energy SO Open Data