N84 Grid

GRUDIE BRIDGE

DNO substation.

Contracted here0.16 GWNot yet connected, as printed
Entries in the queue7entries with a printed MW
Earliest connection date31 Oct 2025Already passed, not yet connected

The queue, in order

Order calculated by N84
First in queue159.1 MW across the first 6 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
GRUDIE BRIDGE (bess)17 Feb 202331 Oct 202550 MW
GRUDIE BRIDGE (hydro)29 Jul 202529 Jul 20261 MW
GRUDIE BRIDGE (hydro)4 Nov 202521 Aug 20264 MW
GRUDIE BRIDGE (hydro)17 May 201930 Jun 20271 MW
GRUDIE BRIDGE (bess)4 Jul 202331 Oct 202749.9 MW
GRUDIE BRIDGE (bess)25 Aug 202328 Feb 202953.2 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW100 MW200 MW2025: 50 MW2026: 55 MW2027: 106 MW2029: 159 MW20252026202720282029159 MW
0 MW100 MW200 MW2025: 50 MW2026: 55 MW2027: 106 MW2029: 159 MW202520272029159 MW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
202550 MW
202655 MW
2027105.9 MW
2029159.1 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1GRUDIE BRIDGE (bess)50 MW0 MW31 Oct 2025not statedgate not printedAccepted to Connect
2GRUDIE BRIDGE (hydro)1 MW50 MW29 Jul 2026not statedgate not printedAccepted to Connect
3GRUDIE BRIDGE (hydro)4 MW51 MW21 Aug 2026not statedgate not printedAccepted to Connect
4GRUDIE BRIDGE (hydro)1 MW55 MW30 Jun 2027not statedgate not printedAccepted to Connect
5GRUDIE BRIDGE (bess)49.9 MW56 MW31 Oct 2027not statedgate not printedAccepted to Connect
6GRUDIE BRIDGE (bess)53.2 MW105.9 MW28 Feb 2029not statedgate not printedAccepted to Connect
7GRUDIE BRIDGE (hydro)1 MW159.1 MWnot statednot statedgate not printedAccepted to Connect

Receipt: MW and dates as printed in the SSEN Embedded Capacity Register, file dated 1 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
2025150 MW
202625 MW
2027250.9 MW
2029153.2 MW
not stated11 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
GRUDIE BRIDGE (battery, 50 MW)Battery storage49.9 MW31 Oct 2025Accepted to Connect
GRUDIE BRIDGE (battery, 49.9 MW)Battery storage49.9 MW31 Oct 2027Accepted to Connect
GRUDIE BRIDGE (battery, 53.2 MW)Battery storage49.4 MW28 Feb 2029Accepted to Connect
GRUDIE BRIDGE (hydro, 12.54 MW)Hydro and pumped storage12.54 MWnot statedConnected
GRUDIE BRIDGE (hydro, 11.4 MW)Hydro and pumped storage11.4 MWnot statedConnected
GRUDIE BRIDGE (hydro, 4 MW)Hydro and pumped storage4 MW21 Aug 2026Accepted to Connect
GRUDIE BRIDGE (hydro, 3.71 MW)Hydro and pumped storage3.71 MWnot statedConnected
GRUDIE BRIDGE (onshore wind, 3.5 MW)Onshore wind3.5 MWnot statedConnected
GRUDIE BRIDGE (other, 2.94 MW)Other2.95 MWnot statedConnected
GRUDIE BRIDGE (onshore wind, 2.85 MW)Onshore wind2.85 MWnot statedConnected
GRUDIE BRIDGE (solar, 2.38 MW)Solar2.38 MWnot statedConnected
GRUDIE BRIDGE (hydro, 1.9 MW)Hydro and pumped storage1.9 MWnot statedConnected
GRUDIE BRIDGE (hydro, 1.9 MW)Hydro and pumped storage1.9 MWnot statedConnected
GRUDIE BRIDGE (hydro, 1.9 MW)Hydro and pumped storage1.9 MWnot statedConnected
GRUDIE BRIDGE (hydro, 1.9 MW)Hydro and pumped storage1.9 MWnot statedConnected
GRUDIE BRIDGE (hydro, 1.43 MW)Hydro and pumped storage1.43 MWnot statedConnected
GRUDIE BRIDGE (hydro, 1.35 MW)Hydro and pumped storage1.35 MWnot statedConnected
GRUDIE BRIDGE (gas, 1.24 MW)Gas1.24 MWnot statedConnected
GRUDIE BRIDGE (hydro, 1.2 MW)Hydro and pumped storage1.2 MWnot statedConnected
GRUDIE BRIDGE (hydro, 1.2 MW)Hydro and pumped storage1.2 MWnot statedConnected
GRUDIE BRIDGE (hydro, 1 MW)Hydro and pumped storage1 MW30 Jun 2027Accepted to Connect
GRUDIE BRIDGE (hydro, 1 MW)Hydro and pumped storage1 MWnot statedAccepted to Connect
GRUDIE BRIDGE (hydro, 0.95 MW)Hydro and pumped storage0.95 MWnot statedConnected
GRUDIE BRIDGE (hydro, 0.77 MW)Hydro and pumped storage0.77 MWnot statedConnected
GRUDIE BRIDGE (other, 0.62 MW)Other0.62 MWnot statedConnected
GRUDIE BRIDGE (other, 0.62 MW)Other0.62 MWnot statedConnected
GRUDIE BRIDGE (hydro, 0.47 MW)Hydro and pumped storage0.48 MWnot statedConnected
GRUDIE BRIDGE (hydro, 0.47 MW)Hydro and pumped storage0.48 MWnot statedConnected
GRUDIE BRIDGE (hydro, 0.47 MW)Hydro and pumped storage0.48 MWnot statedConnected
GRUDIE BRIDGE (hydro, 0.47 MW)Hydro and pumped storage0.48 MWnot statedConnected
GRUDIE BRIDGE (hydro, 0.47 MW)Hydro and pumped storage0.48 MWnot statedConnected
GRUDIE BRIDGE (hydro, 0.47 MW)Hydro and pumped storage0.48 MWnot statedConnected
GRUDIE BRIDGE (hydro, 0.38 MW)Hydro and pumped storage0.38 MWnot statedConnected
GRUDIE BRIDGE (other, 0.28 MW)Other0.28 MWnot statedConnected
GRUDIE BRIDGE (hydro, 0.1 MW)Hydro and pumped storage0.1 MWnot statedConnected
GRUDIE BRIDGE (hydro, 0.1 MW)Hydro and pumped storage0.1 MWnot statedConnected
GRUDIE BRIDGE (other, 0.1 MW)Other0.1 MWnot statedConnected
GRUDIE BRIDGE (hydro, 0.1 MW)Hydro and pumped storage0.1 MWnot statedConnected
GRUDIE BRIDGE (hydro, 0.1 MW)Hydro and pumped storage0.1 MWnot statedConnected
GRUDIE BRIDGE (hydro, 1 MW)Hydro and pumped storage0.04 MW29 Jul 2026Accepted to Connect
GRUDIE BRIDGE (hydro, 4 MW)Hydro and pumped storage0 MW21 Aug 2026Accepted to Connect
GRUDIE BRIDGE (battery, 51.75 MW)Battery storage0 MW31 Dec 2028Accepted to Connect
GRUDIE BRIDGE (onshore wind, 0.5 MW)Onshore wind0 MWnot statedAccepted to Connect
GRUDIE BRIDGE (battery, 50 MW)Battery storage0 MWnot statedAccepted to Connect
GRUDIE BRIDGE (hydro, 4 MW)Hydro and pumped storage0 MWnot statedAccepted to Connect

Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.