N84 Grid

RWE RENEWABLES UK SWINDON LIMITED

Grouped by published name, unverified. Printed as: RWE RENEWABLES UK SWINDON LIMITED.

Sign in to watch this developer
5Projects in the shown registers
341.85 MWTotal MW as printed
0 / 0Dates later / earlier, files since 23 Oct 2025
0Removed from the register, files since 23 Oct 2025

Built and queued

Capacity already connected against capacity still waiting

  • Built: 0.1 GW (28%)
  • Queued: 0.2 GW (72%)
As printed in the shown registers; built is capacity the registers print as connected.
Table view
Built and queued
PartGW
Built0.1
Queued0.2
MW by technology
TechnologyProjectsMW
Onshore wind5341.85 MW
Projects
Project (as published)TechnologyMWCurrent dateStatus (as printed)Connection site
Inveroykel Wind Farm (RWE RENEWABLES UK SWINDON LIMITED)Onshore wind191.4 MW31 Oct 2031ScopingInveroykel Wind Farm 132kV
Golticlay Extension Wind FarmOnshore wind55 MW30 Sep 2027Awaiting ConsentsMybster 2 132/33kV Substation
Novar 2 Wind FarmOnshore wind36.8 MWnot statedBuiltAlness GSP
Goole Fields Wind FarmOnshore wind32 MWnot statedBuiltCamblesforth 66kV Substation
Bad a Cheo Wind FarmOnshore wind26.65 MWnot statedBuiltMybster 3 132/33kV Substation

Counts of what the registers printed. No score and no rank.

Supported by National Energy SO Open Data
Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.
Supported by NGED Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.