RENEWCO POWER LIMITED

Grouped by published name, unverified. Printed as: RENEWCO POWER LIMITED.

Sign in to watch this developer
6Projects in the shown registers
943.8 MWTotal MW as printed
0 / 0Dates later / earlier, files since 23 Oct 2025
0Removed from the register, files since 23 Oct 2025

Built and queued

Capacity already connected against capacity still waiting

  • Queued: 0.9 GW (100%)
As printed in the shown registers; built is capacity the registers print as connected.
Table view
Built and queued
PartGW
Built0.0
Queued0.9
MW by technology
TechnologyProjectsMW
Hybrid5829.8 MW
Battery storage1114 MW
Projects
Project (as published)TechnologyMWCurrent dateStatus (as printed)Connection site
Watchman Energy ParkHybrid249.9 MW31 Oct 2036ScopingWatchman 132kV Substation
Ravengill Renewable Energy ParkHybrid249.9 MW31 Oct 2036ScopingElvanfoot 275/132/33kV
M74 West Wind Farm (RENEWCO POWER LIMITED)Hybrid180 MW31 Oct 2029ScopingM74 West Wind Farm 132kV
Clyde South Energy ParkHybrid120 MW31 Oct 2037ScopingRedshaw 132kV Substation.
Lessnessock Energy Park (RENEWCO POWER LIMITED)Battery storage114 MW30 Oct 2037ScopingLESSNESSOCK ENERGY PARK 132KV SUBSTATION
Minsca extensionHybrid30 MW30 Apr 2033ScopingChapelcross B GSP

Counts of what the registers printed. No score and no rank.

Supported by National Energy SO Open Data
Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.
Supported by NGED Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.