YEOVIL (solar)

Developer as published, connection site, reference: YEOVIL. SSEN-1MW-20b1f8902a00-2. Removed from the register (not present in two consecutive files)

Sign in to watch this project
Capacity0 MWSolar
Connection date6 Dec 2024Status as printed: Accepted to Connect
MW ahead in N84's order at this siteNot calculatedN84 orders only projects at a NESO connection site with a printed date.

Connection date, edition by edition

20242025File dated 2024-06-01: connection date 2024-12-06Dec 2024File dated 2025-02-01: connection date 2024-12-061 Jun20241 Feb2025
20242025File dated 2024-06-01: connection date 2024-12-06Dec 2024File dated 2025-02-01: connection date 2024-12-061 Jun20241 Feb2025

The connection date is printed the same in every file N84 holds for this project, from 1 Jun 2024 to 1 Feb 2025. Year marks on the side are 1 January.

Observed changes

Showing changes in files dated from 23 Sep 2026.

No changes observed in the files N84 holds for this window.