South Wales West Connection Node C 400kV

NESO connection site, host NGET.

Contracted here1.69 GWNot yet connected, as printed
Entries in the queue3entries with a printed MW
Earliest connection date31 Oct 2037Date printed in the register

The queue, in order

Order calculated by N84
First in queue1,687.5 MW across the first 3 projects
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Dates in the queue

From the earliest date we hold to the connection date printed, in queue order

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. Start is the accepted date as printed, else the date N84 first saw the row.
Table view
Dates in the queue
ProjectFromConnection dateMW
Low Carbon Link14 May 202431 Oct 20371,400 MW
NatPower Llanteg Green Energy Park20 Dec 202431 Dec 203747.5 MW
Lightsource Ferryside PV31 May 202431 Oct 2038240 MW

Contracted MW as dates arrive

Running total by connection year, years to scale

0 MW1.0 GW2.0 GW2037: 1.4 GW2038: 1.7 GW203720381.7 GW
0 MW1.0 GW2.0 GW2037: 1.4 GW2038: 1.7 GW203720381.7 GW
Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.
Table view
Cumulative MW by connection year
YearCumulative MW
20371,447.5 MW
20381,687.5 MW

MW ahead in N84's order: calculator

Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator.

Queue

Queue (calculated by N84, method n84_order_v2)
Placecalculated by N84ProjectMW (as published)MW ahead (N84 order)Connection dateGateOrder groupStatus (as printed)
1Low Carbon Link1,400 MW0 MW31 Oct 20371gate 1Scoping
2NatPower Llanteg Green Energy Park47.5 MW1,400 MW31 Dec 20371gate 1Scoping
3Lightsource Ferryside PV240 MW1,447.5 MW31 Oct 20381gate 1Scoping

Receipt: MW and dates as printed in the NESO TEC Register, file dated 20 Oct 2026; the NESO Interconnector Register, file dated 20 Oct 2026. Order calculated by N84: printed queue position where the register gives one; otherwise entries printed as Gate 2 first, then every other entry by connection date. The register prints no gate for many contracted entries; N84 does not guess their position. Not published by the operator. How we order

Contracted MW by effective-from year, as published
Year (MW effective from)ProjectsMW
203721,447.5 MW
20381240 MW

Projects recorded at this site

Projects recorded at this site, as printed
Project (as published)TechnologyMWConnection dateStatus (as printed)
Low Carbon LinkInterconnector1,400 MW31 Oct 2037Scoping
Lightsource Ferryside PVHybrid240 MW31 Oct 2038Scoping
NatPower Llanteg Green Energy ParkBattery storage47.5 MW31 Dec 2037Scoping

Supported by National Energy SO Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.