N84 Grid

Uniper UK Limited

Grouped by published name, unverified. Printed as: Uniper UK Limited.

Sign in to watch this developer
9Projects in the shown registers
5,357.9 MWTotal MW as printed
0 / 0Dates later / earlier, files since 23 Oct 2025
0Removed from the register, files since 23 Oct 2025

Built and queued

Capacity already connected against capacity still waiting

  • Built: 4.8 GW (89%)
  • Queued: 0.6 GW (11%)
As printed in the shown registers; built is capacity the registers print as connected.
Table view
Built and queued
PartGW
Built4.8
Queued0.6
MW by technology
TechnologyProjectsMW
Gas75,083 MW
Hybrid1225 MW
Biomass and waste149.9 MW
Projects
Project (as published)TechnologyMWCurrent dateStatus (as printed)Connection site
Grain (Uniper UK Limited)Gas1,517 MWnot statedBuiltGrain 400kV Substation
Connah's Quay (Uniper UK Limited)Gas1,380 MWnot statedBuiltConnah's Quay 400kV Substation
Killingholme (Uniper UK Limited)Gas619 MWnot statedBuiltKillingholme 400kV Substation
North Killingholme Power ProjectGas540 MW30 Sep 2030Consents ApprovedKillingholme 400kV Substation
CDCLGas445 MWnot statedBuiltCottam 400kV Substation
EnfieldGas442 MWnot statedBuiltBrimsdown 132kV Substation
Ratcliffe on Soar (Uniper UK Limited)Hybrid225 MWnot statedBuiltRatcliffe-On-Soar 400kV Substation
Taylors LaneGas140 MWnot statedBuiltWillesden 132kV Substation
EMERGE CentreBiomass and waste49.9 MW29 Jun 2029Consents ApprovedRatcliffe-On-Soar 400kV Substation

Counts of what the registers printed. No score and no rank.

Supported by National Energy SO Open Data
Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.
Supported by NGED Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.