N84 Grid

FPC ELECTRIC LAND LIMITED

Grouped by published name, unverified. Printed as: FPC ELECTRIC LAND LIMITED.

Sign in to watch this developer
5Projects in the shown registers
524.8 MWTotal MW as printed
0 / 0Dates later / earlier, files since 23 Oct 2025
0Removed from the register, files since 23 Oct 2025

Built and queued

Capacity already connected against capacity still waiting

  • Queued: 0.5 GW (100%)
As printed in the shown registers; built is capacity the registers print as connected.
Table view
Built and queued
PartGW
Built0.0
Queued0.5
MW by technology
TechnologyProjectsMW
Battery storage4389.8 MW
Hybrid1135 MW
Projects
Project (as published)TechnologyMWCurrent dateStatus (as printed)Connection site
Severn Road AvonmouthHybrid135 MW31 Oct 2038ScopingSEABANK 400/33kV SUBSTATION
Lincomb Farm 120MW BESS SchemeBattery storage120 MW30 Jun 2033ScopingBishops Wood 132kV Substation
Ratcliffe on Soar BESSBattery storage120 MW30 Oct 2037ScopingKegworth B (Derbyshire Connection Node C) 132kV Substation
Barge Way 120MW BESSBattery storage99.9 MW31 Oct 2033ScopingKemsley 400kV Substation
Land at Sir William Smith RoadBattery storage49.9 MW31 Oct 2032ScopingArbroath GSP

Counts of what the registers printed. No score and no rank.

Supported by National Energy SO Open Data
Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.
Supported by NGED Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.