N84 Grid

WIND 2 LIMITED

Grouped by published name, unverified. Printed as: WIND 2 LIMITED.

Sign in to watch this developer
7Projects in the shown registers
689 MWTotal MW as printed
0 / 0Dates later / earlier, files since 23 Oct 2025
1Removed from the register, files since 23 Oct 2025

Built and queued

Capacity already connected against capacity still waiting

  • Queued: 0.7 GW (100%)
As printed in the shown registers; built is capacity the registers print as connected.
Table view
Built and queued
PartGW
Built0.0
Queued0.7
MW by technology
TechnologyProjectsMW
Hybrid6674 MW
Onshore wind115 MW
Projects
Project (as published)TechnologyMWCurrent dateStatus (as printed)Connection site
Lincolnshire Energy ParkHybrid500 MW30 Oct 2039ScopingSouth Humber Connection Node A 400kV
Gwynt Alwen WFHybrid108 MW31 Oct 2032ScopingNorth Wales connection Node A 400kV Substation
Brae WFHybrid20 MW30 Aug 2032ScopingLinnmill GSP
GirlstaHybrid18 MW30 Sep 2029ScopingGremista GSP
Swarclett Farm and BESSHybrid18 MW31 Oct 2033ScopingTHURSO 2 275/33KV GRID SUPPLY POINT SUBSTATION
StoneyfieldOnshore wind15 MW30 Sep 2030ScopingRothienorman GSP
CairntawieHybrid10 MW31 Oct 2033ScopingSt Fergus Gas GSP

Counts of what the registers printed. No score and no rank.

Supported by National Energy SO Open Data
Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.
Supported by NGED Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.