N84 Grid

TRIO POWER LIMITED

Grouped by published name, unverified. Printed as: TRIO POWER LIMITED.

Sign in to watch this developer
5Projects in the shown registers
494.9 MWTotal MW as printed
0 / 0Dates later / earlier, files since 23 Oct 2025
0Removed from the register, files since 23 Oct 2025

Built and queued

Capacity already connected against capacity still waiting

  • Queued: 0.5 GW (100%)
As printed in the shown registers; built is capacity the registers print as connected.
Table view
Built and queued
PartGW
Built0.0
Queued0.5
MW by technology
TechnologyProjectsMW
Hybrid5494.9 MW
Projects
Project (as published)TechnologyMWCurrent dateStatus (as printed)Connection site
Cranwell Solar & BESS FarmHybrid300 MW30 Oct 2034ScopingTrent Valley South Connection Node C 400kV Substation
Dupplin SolarHybrid75 MW31 Oct 2035ScopingBurghmuir GSP
Cossans Solar/BESS ProjectHybrid49.9 MW31 Oct 2032ScopingLunanhead GSP
Kirknewton Solar and BESSHybrid40 MW30 Apr 2030ScopingCurrie 275/132kV
Binn Solar FarmHybrid30 MW31 Oct 2035ScopingABERNETHY 2 400/33KV GRID SUPPLY POINT SUBSTATION

Counts of what the registers printed. No score and no rank.

Supported by National Energy SO Open Data
Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.
Supported by NGED Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.