N84 Grid

RWE Renewables UK Solar and Storage Limited

Grouped by published name, unverified. Printed as: RWE Renewables UK Solar and Storage Limited.

Sign in to watch this developer
11Projects in the shown registers
3,964.89 MWTotal MW as printed
0 / 0Dates later / earlier, files since 23 Oct 2025
0Removed from the register, files since 23 Oct 2025

Built and queued

Capacity already connected against capacity still waiting

  • Queued: 4.0 GW (100%)
As printed in the shown registers; built is capacity the registers print as connected.
Table view
Built and queued
PartGW
Built0.0
Queued4.0
MW by technology
TechnologyProjectsMW
Hybrid83,364.99 MW
Solar2500 MW
Battery storage199.9 MW
Projects
Project (as published)TechnologyMWCurrent dateStatus (as printed)Connection site
J212 High Grove SolarHybrid720 MW31 Oct 2031Awaiting ConsentsThetford 400kV Substation
Great Oak SolarHybrid700 MW31 Oct 2034ScopingSouth Anglia Connection Node B 400kV Substation
Chapel Rush SolarHybrid600 MW30 Oct 2035ScopingNorth Humber Connection Node A 400kV Substation
Dove SolarHybrid500 MW31 Oct 2034ScopingNorth Anglia Connection Node E 400kV Substation
Oak Holt SolarHybrid400 MW30 Oct 2034ScopingTrent Valley South Connection Node C 400kV Substation
Stack Hill Solar and StorageHybrid350 MW30 Oct 2034ScopingTrent Valley South Connection Node B 400kV Substation.
Creyke Beck Solar FarmSolar320 MW31 May 2033ScopingCreyke Beck 400kV Substation
Norton Solar FarmSolar180 MW31 Oct 2031ScopingNorton GSP
J102A Oldbury BESSBattery storage99.9 MW31 Oct 2037ScopingSevern Connection Node A 400kv Substation
JBM Solar 12 - Shrewsbury SolarHybrid49.99 MW30 Sep 2028ScopingShrewsbury 400kV Substation
Claydon Solar B (A033)Hybrid45 MW11 Apr 2025ScopingPort Ham 132kV Substation

Counts of what the registers printed. No score and no rank.

Supported by National Energy SO Open Data
Contains data from Scottish and Southern Electricity Networks, licensed under CC BY 4.0.
Supported by NGED Open Data

Data as published by the named source on the stated date. N84 may contain matching or processing errors. Not investment, legal or technical advice. The official register prevails.